C34-ロゴ - ホテルモデルの制作プロセスの詳細表示

その他のビデオ
February 27, 2025
Category Connection: 3Dプリント建築モデル
リゾートホテルのモデル展示の世界に 足を踏み入れます そこでは細部まで 手作業で作り上げています原材料の初期形状から 最終的な繊細なタッチまでこの小さな奇蹟に生命を吹き込む手芸の深遠な評価を得ます
Brief: Discover the intricate process behind the TP-Link Hangzhou Headquarters 1/300 Acrylic Model designed for sea transportation. This video showcases the meticulous craftsmanship, innovative techniques, and stunning details of this architectural masterpiece.
Related Product Features:
  • 1:300 scale model of TP-Link Hangzhou Headquarters, completed in just 15 days.
  • Crafted using high-quality materials like acrylic, CNC, and ABS for durability.
  • Features realistic style with handmade, 3D printing, laser cutting, and CNC cutting techniques.
  • Easy assembly with a single piece, making it convenient for display purposes.
  • Designed for sea transportation, ensuring safe delivery in a freight case.
  • Showcases V-shaped columns and ceiling, highlighting 3D printing precision.
  • Exterior elements adorned in pearl white and deep gray metallic finishes for aesthetic appeal.
  • Glass curtain wall with reflective coating and 30% frosted effect enhances facade design.
FAQ:
  • What is the scale of the TP-Link Hangzhou Headquarters model?
    The model is built at a 1:300 scale, capturing intricate details of the actual building.
  • How long does it take to produce this architectural model?
    The lead time for this model is 15 days, ensuring timely delivery without compromising quality.
  • What materials are used in the construction of this model?
    The model is made from high-quality materials including acrylic, CNC, and ABS, ensuring durability and a realistic appearance.
  • Is the model illuminated?
    No, this model does not include illumination, focusing instead on its detailed craftsmanship and design.